Project List:
 
Below is a portfolio of projects CP Construction has completed, or is in the process of completing:
 
     

Current & Recent Projects

   
Muddy Fork Bridge
Owner: Forest Service
Value: $2,020,486
Dates: 5-15-10 to 9-30-11

CP Construction is building one of the longest spanning vehicular steel truss bridges to ever be constructed in Oregon. The 170' long single span steel truss bridge is being built over the Muddy Fork of the Sandy River.
 
 
 
     
 
     
 

Back to the top




Millport Slough Bridge
Owner: ODOT
Value: $11,476,583
Dates: 9-09 to 11-21-11

This project, which includes more than 600 driven piling, was constructed over Millport Slough on US Highway 101 between the Pacific Ocean and a national wildlife refuge. Accordingly, this job contains stringent environmental standards.
 
 
 
     
 
     
 
     
 
     
 
     
 
     
   

Back to the top




US26-Mckay Creek
Owner: ODOT
Value: $4,093,446
Dates: 6-14-10 to 6-30-11

This project consists of the demolition of two old bridges, construction and removal of two detour bridges, and the construction of two new bridges on US Hwy 26 west of Portland, OR.
 
 
 
     
 
     
   

Back to the top




Naval Center Demolition
Owner: NAVFAC Northwest
Value: $687,989
Dates: 9-09-10 to 11-15-10

This project included the demolition and re-grading of a three and a half acre site in Eugene, OR. Work elements included asbestos and lead surveying, abatement, and demolishing over 30,000 square feet of buildings.
 
     
 
     
   
Back to the top



Rufus Landing
Owner: Corps of Engineers
Value: $941,819
Dates: 9-30-09 to 5-20-10

This was a Design-Build project performed for the Army Corps of Engineers. The project consisted of the complete design and re-construction of 1.3 miles of frontage road along the Columbia River near the John Day Dam.
 
     
 

Back to the top




Past Projects

Tenasillahe Island
Owner: Corps of Engineers
Value: $620,000
Dates: 4-1-07 to 9-15-07

This design build project consisted of tide-gate retrofitting and the construction of two small pre-cast bridges. The project was logistically challenging because it was on an island in the middle of the Columbia River.

 

Back to the top



Siletz River Bridge
Owner: Lincoln County
Value: $3,753,219
Dates: 5-08 to 10-09

This project consisted of road and bridge construction. The bridge was a 360'x36' BT84 Precast Girder Bridge, and the roadwork included excavation, grading, paving, and storm drainage.
 
 
 
     
   

Back to the top